Issue link: https://uberflip.scri.com/i/1544883
INSTITUTIONAL BIOSAFETY COMMITTEE REVIEW BriaCell Therapeutics, Corp./BC-IMT-04/Orr/5/8/2026/Continuing Review 2 of 2 10. Review of proposed facilities and practices: The Chair provided an overview of the arrangement for the facilities and practices. Points of Discussion: 1. The Committee recommended that the Biohazard Sign be revised to indicate which phone numbers are available 24/7. 2. An Institutional Representative stated that non-safety needles used for administration are not recapped and discarded immediately into a sharps container. The Committee recommended that Site Inspection Checklist (#13) be revised to reflect this. 11. Site requirements: The Chair reviewed training and communication requirements for maintaining IBC approval with the Institutional Representatives. 12. Vote on the Site: The Committee voted for the following determination on the Site: X APPROVED CONDITIONALLY APPROVED TABLED DISAPPROVED DETERMINATION VOTE - YES: 4 NO: 0 ABSTAIN: 0 13. Advice to the Institution: None. 14. Meeting adjourned: The meeting was adjourned at 1:14 pm Central Time. 15. Post-meeting notes: None. Documents reviewed: Agenda Protocol, Version 1.5.1, dated 11-14-2025 Investigator's Brochure, Edition 7.2, dated 09-15-2025 Pharmacy Manual, dated 06-02-2025 Research Modification Evaluation, Protocol, Version 1.5 Research Modification Evaluation, Protocol, Version 1.5.1 Research Modification Evaluation, Investigator's Brochure, Edition 7.2 Research Modification Evaluation, Pharmacy Manual, dated 05-19-2025 Research Modification Evaluation, Pharmacy Manual, dated 06-02-2025 Biological Risk Assessment and Summary, updated 12-04-2025 Site Map, dated 05-02-2024 Site Inspection Checklist, expires 04-09-2027, updated 03-13-2026 Photos, dated 04-22-2026 Biohazard Sign, dated 12-09-2025 Biological Safety Cabinet Certification 1, dated 01-12-2026 Biological Safety Cabinet Certification 2, dated 01-12-2026 Biological Safety Cabinet Certification 3, dated 01-12-2026 SOP, Biosafety for SV-BR-1-GM, dated 03-13-2026 Training, Shipping Certifications, expire 2026, 2027 CRRF, dated 02-13-2026 Research Modification Evaluation, Change in PI, dated 12-10-2025 Prior Meeting Minutes, Continuing, dated 05-28-2025
